Related provisions for BIPRU 7.3.33
Table: simplified equity method position risk adjustments
This table belongs to BIPRU 7.3.29R
Instrument |
|
Single equities |
16%2 2 |
Qualifying equity indices2 (see BIPRU 7.3.38R) 2 |
8% |
All other equity indices or baskets |
16%2 2 |
If it is necessary to distinguish between the specific risk position risk adjustment and the general market risk position risk adjustment, the specific risk position risk adjustment for the first and third rows is 8%2 and that for the second row is 0%. The rest of the position risk adjustment in the second column is the general market risk position risk adjustment 2 |
Table: The hedging method of calculating the PRR (equities, debt securities and gold)
This table belongs to BIPRU 7.6.24R(1) - (3)
PRR |
||||
In the money by more than the position risk adjustment |
In the money by less than the position risk adjustment |
|||
Long in security or gold |
Long put |
Zero |
Wp |
X |
Short call |
Y |
Y |
Z |
|
Short in security or gold |
Long call |
Zero |
Wc |
X |
Short put |
Y |
Y |
Z |
|
Where: |
||||
Wp means |
{(position risk adjustment-100%) x The underlying position valued at strike price} |
+ |
The market value of the underlying position |
|
Wc means |
{(100% +position risk adjustment x The underlying position valued at strike price} |
- |
The market value of the underlying position |
|
X means |
The market value of the underlying position multiplied by the appropriate position risk adjustment |
|||
Y means |
The market value of the underlying position multiplied by the appropriate position risk adjustment. This result may be reduced by the market value of the option or warrant, subject to a maximum reduction to zero. |
|||
Z means |
The option hedging method is not permitted; the option standard method must be used. |