Search Result

701 - 720 of 868 items.
Results filter

Search Term(s)

Filter by Modules

Filter by Documents

Filter by Keywords

Effective Period

Similar To

To access the FCA Handbook Archive choose a date between 1 January 2001 and 31 December 2004 (From field only).

SUP 11.2 Purpose

As Published: 2004

SUP 11.2 Purpose

BIPRU 1.2 Definition of the trading book

As Published: 2010

BIPRU 1.2 Definition of the trading book

MAR 5.7 Pre- and post-trade transparency requirements for equity and non- equity instruments: form of waiver and deferral

As Published: 2007

MAR 5.7 Pre- and post-trade transparency requirements for equity and non- equity instruments: form of waiver and deferral

COLL 8.6 Termination, suspension, and schemes of arrangement

As Published: 2008

COLL 8.6 Termination, suspension, and schemes of arrangement

COLL 11.4 Depositaries

As Published: 2013

COLL 11.4 Depositaries

PERG 5.1 Application and purpose

As Published: 2018

PERG 5.1 Application and purpose

CASS 1.4 Application: particular activities

As Published: 2007

CASS 1.4 Application: particular activities

COND 2.5 Suitability

As Published: 2004

COND 2.5 Suitability

PRIN 3.3 Where?

As Published: 2002

PRIN 3.3 Where?

COLL 5.8 Investment powers and borrowing limits for feeder UCITS

As Published: 2011

COLL 5.8 Investment powers and borrowing limits for feeder UCITS

SYSC 2.2 Recording the apportionment

As Published: 2015

SYSC 2.2 Recording the apportionment

PERG 4.2 Introduction

As Published: 2005

PERG 4.2 Introduction

SUP 10C.3 General material about the definition of controlled functions

As Published: 2015

SUP 10C.3 General material about the definition of controlled functions

FEES 6.5 Compensation costs

As Published: 2006

FEES 6.5 Compensation costs

SYSC 3.1 Systems and controls

As Published: 2006

SYSC 3.1 Systems and controls

LR 13.4 Class 1 circulars

As Published: 2007

LR 13.4 Class 1 circulars

DTR 4.4 Exemptions

As Published: 2010

DTR 4.4 Exemptions

CONC 8.9 Lead generators: including firm responsibility in dealing with lead generators

As Published: 2018

CONC 8.9 Lead generators: including firm responsibility in dealing with lead generators

LR 13.1 Preliminary

As Published: 2005

LR 13.1 Preliminary

SUP 3.6 Firms' cooperation with their auditors

As Published: 2007

SUP 3.6 Firms' cooperation with their auditors