Related provisions for SUP 15.3.5

61 - 80 of 90 items.
Results filter

Search Term(s)

Filter by Modules

Filter by Documents

Filter by Keywords

Effective Period

Similar To

To access the FCA Handbook Archive choose a date between 1 January 2001 and 31 December 2004 (From field only).

COLL 12.3.5RRP
An EEA UCITS management company that manages a UCITS scheme must comply with the rules of the FCAHandbook which relate to the constitution and functioning of the UCITS scheme (the fund application rules), as follows:(1) the setting up and authorisation of the UCITS scheme (COLL 1 (Introduction), COLL 2 (Authorised fund applications), COLL 3 (Constitution), COLL 6.5 (Appointment and replacement of the authorised fund manager and the depositary), COLL 6.6 (Powers and duties of
COCON 2.3.3GRP
There are2rules and guidance in SUP 15.3 (General notification requirements) and2SUP 15.11 (Notification of COCON breaches and disciplinary action) that deal with reporting by an SMCR firm3 of COCON breaches to the FCA2.
SYSC 22.5.10GRP
(1) SYSC 22.2.2R(1) to (3) normally has a six year time limit. SYSC 22.2.2R(3)(c) removes that time limit for serious matters. This paragraph (SYSC 22.5.10G) and SYSC 22.5.11G have guidance about this. This guidance is also relevant to the time limits for updating references in SYSC 22.2.6R.(2) The removal of the time limit does not mean that the time that has elapsed since the matter occurred is irrelevant. The length of time that has elapsed is relevant to deciding whether the
Significant changes to, or departures from, a firm's run-off plan are likely to trigger one or more of the firm's obligations to notify the FCA. (See, for example, Principle 11 (Relations with regulators). The guidance in SUP 15.3 (General notification requirements) may also be relevant.)