Search Result

261 - 280 of 1191 items.
Results filter

Search Term(s)

Filter by Modules

Filter by Documents

Filter by Keywords

Effective Period

Similar To

To access the FCA Handbook Archive choose a date between 1 January 2001 and 31 December 2004 (From field only).

LR 1.2 Modifying rules and consulting the FCA

As Published: 2010

LR 1.2 Modifying rules and consulting the FCA

DTR 1A.2 Modifying rules and consulting the FCA

As Published: 2012

DTR 1A.2 Modifying rules and consulting the FCA

SUP 16.8 Persistency reports from insurers and data reports on stakeholder pensions

As Published: 2002

SUP 16.8 Persistency reports from insurers and data reports on stakeholder pensions

EG 8.5 Cancelling a firm’s Part 4A permission on its own initiative

As Published: 2016

EG 8.5 Cancelling a firm’s Part 4A permission on its own initiative

SYSC 19C.1 General application and purpose

As Published: 2014

SYSC 19C.1 General application and purpose

DTR 1C.2 Modifying rules and consulting the FCA

As Published: 2018

DTR 1C.2 Modifying rules and consulting the FCA

MAR 5.7 Pre- and post-trade transparency requirements for equity and non- equity instruments: form of waiver and deferral

As Published: 2007

MAR 5.7 Pre- and post-trade transparency requirements for equity and non- equity instruments: form of waiver and deferral

LR 15.5 Transactions

As Published: 2007

LR 15.5 Transactions

PERG 2.7 Activities: a broad outline

As Published: 2006

PERG 2.7 Activities: a broad outline

REC 3.9 Fees and incentive schemes

As Published: 2013

REC 3.9 Fees and incentive schemes

SUP App 2.8 Ceasing to effect contracts of insurance

As Published: 2002

SUP App 2.8 Ceasing to effect contracts of insurance

SUP 8.2 Introduction

As Published: 2003

SUP 8.2 Introduction

IFPRU 11.4 Information for resolution plans

As Published: 2019

IFPRU 11.4 Information for resolution plans

REC 3.19 Investigations

As Published: 2011

REC 3.19 Investigations

MAR 5A.11 Post-trade transparency requirements for non-equity instruments: form of deferral

As Published: 2017

MAR 5A.11 Post-trade transparency requirements for non-equity instruments: form of deferral

REC 3.12 Legal proceedings

As Published: 2013

REC 3.12 Legal proceedings

REC 1.1 Application

As Published: 2005

REC 1.1 Application

SUP 3.2 Purpose

As Published: 2001

SUP 3.2 Purpose

DISP 1.3 Complaints handling rules

As Published: 2003

DISP 1.3 Complaints handling rules

REC 6.6 Supervision

As Published: 2013

REC 6.6 Supervision