Related provisions for SUP 15.3.16

21 - 40 of 298 items.
Results filter

Search Term(s)

Filter by Modules

Filter by Documents

Filter by Keywords

Effective Period

Similar To

To access the FCA Handbook Archive choose a date between 1 January 2001 and 31 December 2004 (From field only).

SUP 11.5.1RRP

Information to be submitted by the firm (see SUP 11.4.7 R (2)(a))

(1)

The name of the firm;

(2)

the name of the controller or proposed controller and, if it is a body corporate and is not an authorised person, the names of its directors and its controllers;

(3)

a description of the proposed event including the shareholding and voting power of the person concerned, both before and after the change in control; and5

(4)

any other information of which the appropriate regulator7 would reasonably expect notice.5

7
SUP 11.5.2RRP
The notification from a firm under SUP 11.4.7 R (2)(a) need only contain as much of the information set out in SUP 11.5.1 R as the firm is able to provide, having made reasonable enquiries from persons and other sources as appropriate.
SUP 11.5.4AGRP
Firms are also reminded that a change in control may give rise to a notification as a financial conglomerate or a change in the supplementary supervision of a financial conglomerate (see GENPRU 3.14(Cross sector groups) and GENPRU 3.24(Third country groups)). 144
SUP 11.5.8GRP
A firm and its controller or proposed controller may discharge an obligation to notify the appropriate regulator7 by submitting a single joint section 178 notice5containing the information required from the firm and the controller or proposed controller. In this case, the section 178 notice53 may be used on behalf of both the firm and the controller or proposed controller.75355
SUP 11.5.9GRP
If a person is proposing a change in control over more than one firm within a group, then the controller or proposed controller may submit a single section 178 notice5 to the PRA7 in respect of all those firms which are PRA-authorised persons and a single section 178 notice to the FCA in respect of all those firms which are not PRA-authorised persons.7 The section 178 notice5should contain all the required information as if separate notifications had been made, but information
SUP 11.5.10GRP
When an event occurs (for example, a group restructuring or a merger) as a result of which: (1) more than one firm in a group would undergo a change in control; or(2) a single firm would experience more than one change in control;then, to avoid duplication of documentation, all the firms and their controllers or proposed controllers may discharge their respective obligations to notify the appropriate regulator7 by submitting a single section 178 notice5 to the PRA7 containing
BIPRU 8.6.1BRRP
3A firm must notify the appropriate regulator in writing of the intention of another member of its group which is not a firm to issue a capital instrument which the firm intends to include within its capital resources or the consolidated capital resources of its UK consolidation group or non-EEA sub-group as soon as it becomes aware of the intention of the groupundertaking to issue the capital instrument. When giving notice, a firm must:(1) provide details of the amount of capital
BIPRU 8.6.1CRRP
3A firm must provide a further notification to the appropriate regulator in writing including all the information required in BIPRU 8.6.1BR (1) to (4) as soon as it becomes aware of any changes that are proposed to the intended date of issue, amount of issue, type of investors, stage of capital or any other feature of the capital instrument previously notified to the appropriate regulator.
BIPRU 8.6.1DRRP
3If a groupundertaking proposes to establish a debt securities program for the issue of capital instruments which the firm intends to include within its capital resources or the consolidated capital resources of its UK consolidation group or non-EEA sub-group, it must:(1) notify the appropriate regulator of the establishment of the program; and(2) provide the information required by BIPRU 8.6.1BR (1) to (4); as soon as it becomes aware of the proposed establishment. The appropriate
BIPRU 8.6.1ERRP
3The capital instruments to which BIPRU 8.6.1B R does not apply are:(1) ordinary shares issued by a groupundertaking which:(a) are the most deeply subordinated capital instrument issued by that groupundertaking;(b) meet the criteria set out in GENPRU 2.2.83R (2) and GENPRU 2.2.83R (3) and GENPRU 2.2.83A R; and(c) are the same as ordinary shares previously issued by that groupundertaking;(2) debt instruments issued from a debt securities program established by a groupundertaking,
BIPRU 8.6.1FRRP
3A firm must notify the appropriate regulator in writing, no later than the date of issue, of the intention of a groupundertaking to issue a capital instrument listed in BIPRU 8.6.1E R which the firm intends to include within its capital resources or the consolidated capital resources of its UK consolidation group or non-EEA sub-group. When giving notice a firm must:(1) provide the information set out at BIPRU 8.6.1BR (1) to (3); and(2) confirm that the terms of the capital instrument
BIPRU 8.6.9RRP
A firm must give one Month's prior notice to the appropriate regulator before starting to use or stopping using the method in GENPRU 2 Annex 5 (Capital resources table for a BIPRU investment firm deducting illiquid assets).
BIPRU 8.6.20RRP
A firm must comply with the requirements set out in GENPRU 2.2.135R (Notifying the appropriate regulator of unusual transactions in relation to indirectly issued capital) and GENPRU 2.2.137 R (Contents of marketing documents in relation to indirectly issued capital) in relation to consolidated indirectly issued capital included in consolidated capital resources.
CASS 11.2.1RRP
(1) A CASS debt management firm must, once every year and by the time it is required to make a notification in accordance with CASS 11.2.4 R, determine whether it is a CASS large debt management firm or a CASS small debt management firm according to the amount of client money which it held during the previous year or, if it did not hold client money during the previous year, according to the amount of client money it projects to hold in the following year, in each case using the
CASS 11.2.4RRP
Once every calendar year, a CASS debt management firm must notify the FCA, in writing, of the information in (1), (2) or (3), as applicable, and the information in (4), in each case no later than the day specified in (1) to (4):(1) if it held client money in the previous calendar year, the highest total amount of client money held during the previous calendar year, notification of which must be made no later than the fifteenth business day of January; or (2) if it did not hold
CASS 11.2.5RRP
For the purpose of the annual notification in CASS 11.2.4 R, a CASS debt management firm must apply the calculation rule in CASS 11.2.2 R.
CASS 11.2.7RRP
(1) Notwithstanding CASS 11.2.3 R, provided that the conditions in (2) are satisfied, a CASS debt management firm that would otherwise be classified as a CASS small debt management firm under the limits provided for in CASS 11.2.3 R may elect to be treated as a CASS large debt management firm.(2) The conditions to which (1) refers are that in either case: (a) the election is notified to the FCA in writing;(b) the notification in accordance with (a) is made at least one week before
CASS 11.2.8RRP
A firm's 'CASS debt management firm type' and any change to it takes effect:(1) if the firm notifies the FCA in accordance with CASS 11.2.4 R (1) or CASS 11.2.4 R (2), on 1 February following the notification; or(2) if the firm notifies the FCA in accordance with CASS 11.2.4 R (3), on the day it begins to hold client money; or(3) if the firm makes an election under CASS 11.2.7 R and provided the conditions in CASS 11.2.7 R (2) are satisfied, on the day the notification made under
CASS 11.2.9GRP
Any written notification made to the FCA under this chapter should be marked for the attention of: "Debt Management Client Assets Firm Classification".
RCB 3.5.2DRP
If an owner proposes to transfer the asset pool to a new owner it must provide the FCA as a minimum with the following information in writing at least three months before the proposed transfer date:(1) name, address and contact details of the proposed new owner;(2) proposed transfer date and reasons for the transfer;(3) an explanation of how the proposed new owner will comply with the requirements imposed on it by the RCB Regulations and RCB; and(4) confirmation that the existing
RCB 3.5.4DRP
If an issuer proposes to make a material change to the contractual terms of a regulated covered bond, it must inform the FCA of the following information to the FCA at least 3 months before the proposed date of the change:(1) details of the proposed change including proposed date of change and the reasons for it;(2) an assessment of the impact of the change on the ability of the issuer and owner to continue to comply with their requirements under the RCB Regulations and RCB; and
RCB 3.5.6DRP
The issuer or the owner, as the case may be, must notify the FCA immediately, in writing by e-mail or hand-delivered letter, if Regulation 18(2), or 24(1)(c) of the RCB Regulations (obligation to inform FCA if asset pool not capable, or not likely to be capable of covering claims) is triggered.
RCB 3.5.7DRP
The issuer or the owner, as the case may be, must notify the FCA immediately in writing by e-mail, or hand-delivered letter, if requirements relating to the relevant regulated covered bond under the RCB Regulations or RCB are, or are likely to be, materially breached, or of any other matter which the FCA should be made aware of.
RCB 3.5.8GRP
The issuer or the owner, as the case may be, should include details of proposals to rectify the breach at the time they notify, or as soon as practicable after that time.
RCB 3.5.9DRP
1The issuer must notify the FCA if it proposes to cancel in full or in part a regulated covered bond or programme at least 3 business days before the cancellation will take effect.
RCB 3.5.11DRP
1The issuer must publish the asset notification form sent to the FCA under RCB 3.3.1 D.
LR 8.7.7RRP
A sponsor must provide to the FCA on or after the first business day of January in each year but no later than the last business day of January in each year:77(1) written confirmation that it continues to satisfy the criteria for approval as a sponsor as set out in LR 8.6.5 R; and5(1A) for each of the criteria in that rule, evidence8 of the basis upon which it considers that it meets that criterion8.588(2) [deleted]55(3) [deleted]55(4) [deleted]55
LR 8.7.7ARRP
7Written confirmation must be provided by submitting a completed Sponsor Annual Notification Form to the FCA at the FCA's address.[Note: The Sponsor Annual Notification Form can be found on the UKLA section of the FCA's website.]
LR 8.7.8RRP
A sponsor must notify the FCA in writing as soon as possible if:(1) 8(a) 8the sponsor ceases to satisfy the criteria for approval as a sponsor set out in LR 8.6.5 R or becomes aware of any matter which, in its reasonable opinion, would be relevant to the FCA in considering whether the sponsor continues to comply with LR 8.6.6 R; or(b) 8the sponsor becomes aware of any fact or circumstance relating to the sponsor or any of its employees engaged in the provision of sponsor services
LR 8.7.8ARRP
8Where a sponsor is of the opinion that notwithstanding the circumstances giving rise to a notification obligation under LR 8.7.8 R, it continues to satisfy the ongoing criteria for approval as a sponsor in accordance with LR 8.6.6 R, it must include in its notification to the FCA a statement to that effect and the basis for its opinion.
LR 8.7.9GRP
General notifications may be made in the first instance by telephone, but must be confirmed promptly in writing.
LR 8.7.10GRP
Written notifications should be sent to the Sponsor Supervision Team at the FCA's address.
LR 8.7.21AGRP
8Examples of when a sponsor should submit a cancellation request pursuant to LR 8.7.22 R include, but are not limited to:(1) situations where the sponsor ceases to satisfy the ongoing criteria for approval as a sponsor in accordance with LR 8.6.6 R and, following a notification made under LR 8.7.8 R, there are no ongoing discussions with the FCA which could lead to the conclusion that the sponsor remains eligible; or(2) where there is a change of control of the sponsor or any
LR 8.7.26AGRP
11A sponsor may wish to consider submitting a suspension request under LR 8.7.25 R where the sponsor:(1) ceases to satisfy the ongoing criteria for approval as a sponsor in accordance with LR 8.6.6 R; (2) has notified the FCA in accordance with LR 8.7.8 R;(3) is having ongoing discussions with the FCA regarding remedial action; and(4) is undertaking remedial action which may result in the sponsor being able to satisfy the ongoing criteria for approval in accordance with LR 8.6.6
REC 6.7.1RRP
The notification rules in this chapter, which are made under sections 293 (Notification requirements) and 295 of the Act (Notification: overseas investment exchanges and overseas clearing houses), apply to all ROIEs1.1
REC 6.7.2GRP
The notification rules in this chapter are made by the FCA1 in order to ensure that it is provided with notice of events and information which it reasonably requires for the exercise of its functions under the Act. 1
REC 6.7.7RRP
Where an ROIE1 proposes to change: (1) its address in the United Kingdom for the service of notices or other documents required or authorised to be served on it under the Act; or(2) the address of its head office;it must give notice to the FCA1 and inform it of the new address at least 14 days before the change is effected.1
REC 6.7.8RRP
Where an ROIE1 has notice that any licence, permission or authorisation which it requires to conduct any regulated activity in its home territory has been or is about to be:1(1) revoked; or(2) modified in any way which would materially restrict the ROIE1 in performing any regulated activity in its home territory or in the United Kingdom;1it must immediately notify the FCA1 of that fact and must give the FCA1 the information specified for the purposes of this rule in REC 6.7.9
REC 6.7.10RRP
Any notice to be given or information to be supplied under these notification rules must be supplied in English, and any document to be provided must be accompanied, if not in English, by an accurate English translation.
REC 6.7.12RRP
The rules relating to the form and method of notification in REC 3.2 also apply to ROIEs1.1
REC 6.7.13GRP
ROIEs 1may apply to the FCA1 for a waiver of any of the notification rules. The procedure is the same as that for applications from UK recognised bodies. Guidance on the procedure is given in REC 3.3.1
SUP 15.2.1GRP
A firm is required to provide the appropriate regulator9 with a wide range of information to enable the appropriate regulator9 to meet its responsibilities for monitoring the firm's compliance with requirements imposed by or under the Act. Some of this information is provided through regular reports, including those set out in SUP 16 (Reporting requirements) and SUP 17 (Transaction reporting). In addition, other chapters in the Handbook set out specific notification and reporting
SUP 15.2.2GRP
This chapter sets out:(1) guidance on the type of event or change in condition which a firm should consider notifying in accordance with Principle 11; the purpose of this guidance is to set out examples and not to give comprehensive advice to firms on what they should notify in order to be in compliance with Principle 11;(2) rules on events and changes in condition that a firm must notify; these are the types of event that the appropriate regulator9 must be informed about, usually
SUP 15.2.3GRP
Rules and guidance have also been included to set out how firms should make a notification and to determine when it may be appropriate to discuss matters with their usual supervisory contact at the appropriate regulator9 by telephone (SUP 15.7).
REC 4.2B.1GRP
1Under section 312C of the Act, if a UK RIE wishes to make arrangements in an EEA State other than the UK to facilitate access to or use of a regulated market,2multilateral trading facility or auction platform2 operated by it, it must give the FCA3written notice of its intention to do so. The notice must:3(1) describe the arrangements; and(2) identify the EEA State in which the UK RIE intends to make them.
REC 4.2B.2GRP
The FCA3 must, within one month of receiving the UK RIE's notice, send a copy of it to the Host State regulator.3
REC 4.2B.3GRP
The UK RIE may not make the arrangements until the FCA3 has sent a copy of the notice to the Host State regulator. 3
REC 4.2B.4GRP
The requirements that a UK RIE must give the FCA3 written notice and the UK RIE may not make the arrangements until the FCA3 has sent a copy of it to the Host State regulator do not apply to arrangements made by a UK RIE on or before 31 October 2007.33
RCB 3.3.1DRP
The issuer must send to the FCA, information relating to the asset pool, in the form set out in RCB 3 Annex 2D (asset notification form), and information relating to the regulated covered bonds issued under the programme, in the form set out in RCB 3 Annex 3 D (asset and liability profile form).1
RCB 3.3.2DRP
The issuer must send the asset notification form1 to the FCA each month following the registration date, and the asset and liability profile form to the FCA1 within one month of the end of each quarter following the registration date.1
RCB 3.3.3DRP
If the issuer is in insolvency, the owner must send to the FCA the notifications set out at RCB 3.3.1 D and RCB 3.3.2A D1 by the same dates as the dates the notifications under those directions are due. 1
RCB 3.3.5DRP
1If the issuer or the owner (as the case may be) proposes to add or remove assets to or from the asset pool which change the level of over collateralisation by 5% or more, it must notify the FCA using the form set out in RCB 3 Annex 2 D (asset notification form) at least 5 business days prior to the proposed transfer, giving expected details of the size and composition of the transfer.
REC 3.13.1GRP
(1) The purpose of REC 3.13 is to enable the FCA2to monitor any significant instances where UK recognised bodies outsource their functions to other persons (as permitted 1under Regulation 6 of the Recognition Requirements Regulations or, in relation to an RAP, under regulation 13 of the RAP regulations1. See REC 2.2 and REC 2A.2).121(2) The FCA2does not need to be notified of every instance of outsourcing by a UK recognised body, but only where an activity or activities which
REC 3.13.2RRP
Where a UK recognised body makes an offer or agrees to delegate any of its relevant functions to another person, it must immediately give the FCA2notice of that event, and:2(1) inform the FCA2of the reasons for that delegation or proposed delegation;2(2) inform the FCA2of the reasons why it is satisfied that it will continue to meet the recognition requirements or (for an RAP) RAPrecognition requirements1 following that delegation;2(3) where it makes such an offer by issuing a
REC 3.13.3RRP
A UK recognised body must immediately give the FCA2notice, where it makes an offer or agrees to undertake any relevant function of another UK recognised body.2
RCB 3.6.1RRP
If an issuer or owner does not provide the notifications to the FCA required by directions made under this chapter by the date specified, then that issuer or owner must pay to the FCA an administrative fee of £250.
RCB 3.6.3GRP
The form and content of the notifications in this chapter are a matter for direction by the FCA which will determine any additional information and documentation required on a case-by-case basis.
RCB 3.6.5DRP
Unless otherwise stated, the issuer or the owner, as the case may be, must send the relevant forms and information to the FCA's address marked for the attention of the "Covered Bonds Team, Capital Markets Sector" by any of the following methods:(1) post; or(2) leaving it at the FCA's address and obtaining a time-stamped receipt; or(3) email to rcb@fca.org.uk.
SUP 12.7.3GRP
A firm need not notify the FCA of any restrictions imposed on the regulated activities for which the firm has accepted responsibility (under SUP 12.7.2 G (4)) if the firm accepts responsibility for the unrestricted scope of the regulated activities.
SUP 12.7.3AGRP
Where a notification is linked to an application for approval under section 59 of the Act (Approval for particular arrangements), see SUP 10A.13.7 G21.121
SUP 12.7.7RRP
(1) If:434(a) (i) the scope of appointment of an appointed representative is extended to cover insurance mediation activities for the first time; and42(ii) the appointed representative is not included on the Financial Services Register as carrying on insurance mediation activities in another capacity; or42(b) the scope of appointment of an appointed representative ceases to include insurance mediation activity;42the appointed representative's principal must give written notice
SUP 12.7.8RRP
(1) As soon as a firm has reasonable grounds to believe that any of the conditions in SUP 12.4.2 R,SUP 12.4.6 R or SUP 12.4.8A R4 (as applicable) are not satisfied, or are likely not to be satisfied, in relation to any of its appointed representatives, it must complete and submit to the FCA the form in SUP 12 Annex 4 R (Appointed representative notification form), in accordance with the instructions on the form.3(2) In its notification under SUP 12.7.8 R (1), the firm must state
SUP 12.7.8ARRP
(1) 8Subject to (2A), a 9firm other than a credit union must submit the form as set out in SUP 12 Annex 4 R online at http://www.fca.org.uk using the FCA'sONA10system.910(2) A credit union must submit the form in SUP 12 Annex 4 R in the way set out in SUP 15.7.4 R to SUP 15.7.9 G (Form and method of notification).(2A) If the notification:9(a) relates to an appointed representative whose scope of appointment covers only credit-related regulated activity; or9(b) is of a change to
SUP 14.3.3GRP
The relevant requirements in regulation 5(3) are that:(1) the incoming EEA firm has given a notice to the FCA12 (see SUP 14.4.1 G) and to its Home State regulator stating the details of the proposed change;12(2) if the change arises from circumstances beyond the incoming EEA firm's control, that firm has, as soon as practicable, given to the appropriate UK regulator12 and to its Home State regulator the notice in (1).112
SUP 14.3.4GRP
Under regulation 5(4), the FCA12 is required, as soon as practicable after receiving the notice in SUP 14.3.3 G, to inform the incoming EEA firm of any consequential changes in the applicable provisions.12
SUP 14.3.4BGRP
5The relevant requirements in regulation 5A(3) are that:(1) the incoming EEA firm has given notice to its Home State regulator stating the details of the proposed change; and(2) the period of one month beginning with the day on which the incoming EEA firm gave that notice has elapsed.
SUP 14.3.4CGRP
5Under regulation 5(4), the FCA12 is required, as soon as practicable after receiving the notice in SUP 14.3.4B G, to inform the incoming EEA firm of any consequential changes in the applicable provisions.12
SUP 14.3.13GRP
9Where the change arises from circumstances within the control of the incoming EEA firm, the relevant requirements in regulation 7B(4) are that: (1) the incoming EEA firm has given a notice to the FCA and its Home State regulator stating the details of the proposed changes; and (2) either: (a) the FCA has informed the incoming EEA firm that it may make the change; or(b) a period of one month has elapsed beginning with the day on which the incoming EEA firm gave the notice under
SUP 14.3.14GRP
9Where the change arises from circumstances beyond the incoming EEA firm's control, the incoming EEA firm is required by regulation 7B(5) to give a notice to the FCA and to its Home State regulator stating the details of the change as soon as reasonably practicable.
LR 12.5.1RRP
Except where the purchases will consist of individual transactions made in accordance with the terms of issue of the relevant securities, where1 a listed company intends to purchase any of its securities convertible into its equity shares2 with a premium listing2 it must:1(1) ensure that no dealings in the relevant securities are carried out by or on behalf of the company or any member of its group until the proposal has either been notified to a RIS or abandoned; and(2) notify
LR 12.5.2RRP
Any purchases, early redemptions or cancellations of a company's own securities convertible into equity shares with a premium listing,2 by or on behalf of the company or any other member of its group must be notified to a RIS when an aggregate of 10% of the initial amount of the relevant class of securities has been purchased, redeemed or cancelled, and for each 5% in aggregate of the initial amount of that class acquired thereafter.2
LR 12.5.3RRP
The notification required by LR 12.5.2 R must be made as soon as possible and in any event no later than 7:30 a.m. on the business day following the calendar day on which the relevant threshold is reached or exceeded. The notification must state:(1) the amount of securities acquired, redeemed or cancelled since the last notification; and(2) whether or not the securities are to be cancelled and the number of that class of securities that remain outstanding.
LR 12.5.5RRP
In circumstances where the purchase is not being made pursuant to a tender offer and the purchase causes a relevant threshold in LR 12.5.2 R to be reached or exceeded, no further purchases may be undertaken until after a notification has been made in accordance with LR 12.5.2 R to LR 12.5.4 R.
FEES 6.2.1ARRP
(1) 3Except as set out in (3), a participant firm which does not conduct business that could give rise to a protected claim by an eligible claimant and has no reasonable likelihood of doing so is exempt from a specific costs levy, or a compensation costs levy, or both, provided that:(a) it has notified the FSCS in writing that those conditions apply; and(b) the conditions in fact continue to apply.(2) The exemption takes effect from the date on which the notice was received by
FEES 6.2.4RRP
A participant firm which is exempt under FEES 6.2.1 R must notify the FSCS in writing as soon as reasonably practicable if the conditions in FEES 6.2.1 R no longer apply.
FEES 6.2.6RRP
FEES 6.2.7GRP
The financial year of the compensation scheme is the twelve months ending on 31 March. The effect of FEES 6.2.6 R and FEES 6.2.1 R (2) is that if a firm fails to notify FSCS of an exemption under FEES 6.2.1 R by 31 March it will be treated as non-exempt for the whole of the next financial year.2
INSPRU 8.2.23RRP
The Society must, as soon as it is practical to do so, notify the appropriate regulator of its intention to approve the form of any new Lloyd's trust deed.
INSPRU 8.2.24RRP
The Society must, as soon as it is practical to do so, notify the FCA2of its intention to make any amendment which may alter the meaning or effect of any byelaw, including:2(1) any Lloyd's trust deed;(2) any standard form letter of credit prescribed by the Society from time to time; or(3) any standard form guarantee agreement prescribed by the Society from time to time.
INSPRU 8.2.25RRP
The Society must provide the FCA2with full details of:2(1) the form of any new Lloyd's trust deed it intends to approve, as described in INSPRU 8.2.23 R and(2) any amendments falling within INSPRU 8.2.24 R.
INSPRU 8.2.28RRP
The information provided to the 2FCA2by the Society under INSPRU 8.2.25 R must include:(1) a statement of the purpose of any proposed amendment or new Lloyd's trust deed and the expected impact, if any, on policyholders, managing agents, members, and potential members; and(2) a description of the consultation undertaken under INSPRU 8.2.26 R including a summary of any significant responses to that consultation.
INSPRU 8.2.29GRP
The FCA2would normally expect to receive the information required under INSPRU 8.2.25 R and INSPRU 8.2.28 R not less than three months in advance of the proposed change.2
BIPRU 12.9.9GRP
Consistent with Principle 11 (Relations with regulators), the appropriate regulator will expect a firm to notify it if the firm does not propose to follow its individual liquidity guidance. The appropriate regulator will expect any such notification to be accompanied by a clear account of the firm's reasons for considering the individual liquidity guidance to be inappropriate. The appropriate regulator will expect to receive any such notification within one month from the date
BIPRU 12.9.16GRP
Consistent with Principle 11 of the appropriate regulator'sPrinciplesfor Businesses (Relations with regulators), if a firm has not accepted individual liquidity guidance given by the appropriate regulator it should, nevertheless, notify the appropriate regulator as soon as it becomes aware of either of the events identified in BIPRU 12.9.14R (2)(a) or (b).
BIPRU 12.9.17RRP
No later than two days after the day on which a firm notifies the appropriate regulator under BIPRU 12.9.13R (1), the firm must submit a liquidity remediation plan to the appropriate regulator.
BIPRU 12.9.25RRP
Notification to the appropriate regulator under BIPRU 12.9.13R (1) and submission to the appropriate regulator under BIPRU 12.9.17 R must be made to the following appropriate regulator email address: data_collection@fca.org.uk.
BIPRU 12.9.26GRP
Although BIPRU 12.9.25 R requires notification and submission in the way prescribed in that rule, the appropriate regulator expects that a firm would also bring to the attention of its usual supervisory contact at the appropriate regulator the fact that it had made such a notification or submission.
BIPRU 12.9.27GRP
For the purpose of the notification expected under BIPRU 12.9.26 G, the appropriate regulator would expect any such notification to be made in the way envisaged in BIPRU 12.9.25 R.
REC 3.3.1GRP
Under section 294 of the Act (Modification or waiver of rules), the FCA1 may, on the application or with the consent of a recognised body (including an ROIE),1 direct that any notification rule is not to apply to the body or is to apply with such modifications as may be specified in the waiver.11
REC 3.3.3GRP
Under section 294(4) of the Act, before the FCA1 may give a waiver of notification rules, it must be satisfied that:1(1) compliance by the recognised body with those notification rules, or with those rules as unmodified, would be unduly burdensome or would not achieve the purpose for which those rules were made; and(2) the waiver would not result in undue risk to persons whose interests those rules are designed to protect.
REC 3.3.4GRP
Where a recognised body wishes to make an application to the FCA1 for a waiver of a notification rule, it should in the first instance inform its usual supervisory contact at the FCA.111
REC 3.3.7GRP
Any waiver given by the FCA1 under section 294 of the Act will be made in writing, stating: 1(1) the name of the recognised body in respect of which the waiver is made;(2) the notification rules which are to be waived or modified in respect of that body;(3) where relevant, the manner in which any rule is to be modified;(4) any condition or time limit to which the waiver is subject; and(5) the date from which the waiver is to take effect.
RCB 3.2.9AGRP
1Where possible, the director or senior manager who signs the annual confirmation should be the same director or senior manager who has verified the application for registration under RCB 2.2.6 D. If the director or senior manager is different to the director or senior manager who verified the application for registration, the issuer should notify the FCA at least one month before sending the confirmation to the FCA.
RCB 3.2.10DRP
If the issuer is in insolvency, the owner must send the FCA under RCB 3.2.1 D:(1) a confirmation of compliance within one month of the date of insolvency; and(2) annual confirmations by the same dates as the date the confirmations under RCB 3.2.5 D are due.
RCB 3.2.11DRP
(1) The owner must ensure that a duly authorised representative signs the confirmation and confirms on the FCA's form that the owner has obtained the appropriate third party advice or reports required by this section.(2) The owner must obtain appropriate advice in the same manner as set out in RCB 3.2.2 D and must provide a copy of the asset pool monitor's report to the FCA as set out in RCB 3.2.4B D.1
RCB 3.2.14GRP
1As required under Regulation 17A of the RCB Regulations, if it appears to the asset pool monitor that the issuer or owner (as the case may be) has failed to comply with the requirements set out in Regulations 17 or 24 of the RCB Regulations, or has not provided all relevant information or explanations, the asset pool monitor must report that to the FCA in writing as soon as possible.
RCB 3.2.15GRP
1If the asset pool monitor is changed, the issuer (or owner, as the case may be) should notify the FCA when the new asset pool monitor is appointed, giving the name of the new asset pool monitor and details of the reason for the change.
SUP 15.6.1RRP
A firm must take reasonable steps to ensure that all information it gives to the appropriate regulator9 in accordance with a rule in any part of the Handbook (including Principle 11) is:9(1) factually accurate or, in the case of estimates and judgments, fairly and properly based after appropriate enquiries have been made by the firm; and(2) complete, in that it should include anything of which the appropriate regulator9 would reasonably expect notice.9
SUP 15.6.2GRP
SUP 15.6.1 R applies also in relation to rules outside this chapter, and even if they are not notification rules. Examples of rules and chapters to which SUP 15.6.1 R is relevant, are:(1) Principle 11, and the guidance on Principle 11 in SUP 2 (Information gathering by the FCA and PRA99 on their9 own initiative);9(2) SUP 15 (Notifications to the appropriate regulator):99(3) SUP 16 (Reporting requirements); (4) SUP 17 (Transaction reporting); 1(5) any notification rule (see Schedule
SUP 15.6.4RRP
If a firm becomes aware, or has information that reasonably suggests that it has or may have provided the appropriate regulator9 with information which was or may have been false, misleading, incomplete or inaccurate, or has or may have changed in a material particular, it must notify the appropriate regulator9 immediately. Subject to SUP 15.6.5 R, the notification must include:99(1) details of the information which is or may be false, misleading, incomplete or inaccurate, or
SUP 15.6.5RRP
If the information in SUP 15.6.4 R (3) cannot be submitted with the notification (because it is not immediately available), it must instead be submitted as soon as possible afterwards.