Related provisions for BIPRU 7.9.47

1 - 19 of 19 items.
Results filter

Search Term(s)

Filter by Modules

Filter by Documents

Filter by Keywords

Effective Period

Similar To

To access the FCA Handbook Archive choose a date between 1 January 2001 and 31 December 2004 (From field only).

INSPRU 1.2.28AGRP
A firm may include amounts recoverable from an ISPV in the cash flows to be valued in a prospective valuation if it obtains a waiver of INSPRU 1.2.28 R under sections 138A and 138B of the Act. The conditions that will need to be met, in addition to the statutory tests under section 138A(4) of the Act, before the PRA will consider granting such a waiver are set out in INSPRU 1.6.13 G to INSPRU 1.6.18 G.
BIPRU 13.6.54RRP
A firm must have the systems capability to estimate EE daily if necessary, unless it is able to demonstrate to the appropriate regulator that its exposures to CCR warrant less frequent calculation. The firm must compute EE along a time profile of forecasting horizons that adequately reflects the time structure of future cash flows and maturity of the contracts and in a manner that is consistent with the materiality and composition of the exposures.[Note: BCD Annex III Part 6 point