Related provisions for MCOB 13.3.11

21 - 40 of 73 items.
Results filter

Search Term(s)

Filter by Modules

Filter by Documents

Filter by Keywords

Effective Period

Similar To

To access the FCA Handbook Archive choose a date between 1 January 2001 and 31 December 2004 (From field only).

COLL 6.2.5RRP
(1) Units in an ICVC are issued or cancelled by the ACD making a record of the issue or cancellation and of the number of the units of each class concerned, and cannot be issued or cancelled in any other manner, unless COLL 3.2.6R (11) (Table: contents of the instrument constituting the scheme) applies.(2) The time of the issue or cancellation under (1) is the time when the record is made.
COLL 6.2.12GRP

Explanatory table: This table belongs to COLL 6.2.2 G (4) (Purpose).

Correction of box management errors

1

Controls by authorised fund managers

An authorised fund manager needs to be able to demonstrate that it has effective controls over:

(1)

its calculations of what units are owned by it (its 'box'); and

(2)

compliance with COLL 6.2.8 R which is intended to prevent a negative box.

2

Controls by depositaries

(1)

Under COLL 6.6.4 (General duties of the depositary), a depositary should take reasonable care to ensure that a scheme is managed in accordance with COLL 6.2 (Dealing) and COLL 6.3 (Pricing and valuation).

(2)

A depositary should therefore make a regular assessment of the authorised fund manager's box management procedures (including supporting systems) and controls. This should include reviewing the authorised fund manager's controls and procedures when the depositary assumes office, on any significant change and on a regular basis, to ensure that a series of otherwise minor changes do not have a cumulative and a significant effect on the accuracy of the controls and procedures.

3

Recording and reporting of box management errors

(1)

An authorised fund manager should record all errors which result in a breach of COLL 6.2.8 R (Controls over the issue and cancellation of units) and as soon as an error is discovered, the authorised fund manager should report the fact to the depositary, together with details of the action taken, or to be taken, to avoid repetition of the error.

(2)

A depositary should report material box management errors to the FSA immediately. Materiality should be determined by taking into account a number of factors including:

  • the implications of the error for the sufficiency of controls put into place by the authorised fund manager;
  • the significance of any breakdown in the authorised fund manager's management controls or other checking procedures;
  • the significance of any failure of systems or back-up arrangements;
  • the duration of an error; and
  • the level of compensation due to the scheme, and an authorised fund manager's ability (or otherwise) to meet claims for compensation in full.

(3)

A depositary should also make a return to the FSA (in the manner prescribed by SUP 16.6.8 R) on a quarterly basis.

COLL 6.6.4RRP
(1) The depositary of an authorised fund must take reasonable care to ensure that the scheme is managed by the authorised fund manager in accordance with:(a) COLL 5 (Investment and borrowing powers);(b) COLL 6.2 (Dealing);(c) COLL 6.3 (Valuation and pricing);(d) COLL 6.8 (Income: accounting, allocation and distribution); and(e) any provision of the instrument constituting the scheme or prospectus that relates to the provisions referred to in (a) to (d).(2) The depositary must,
COLL 6.6.6RRP
(1) The authorised fund manager must make and retain for six years such records as enable:(a) the scheme and the authorised fund manager to comply with the rules in this sourcebook and the OEIC Regulations; and(b) it to demonstrate at any time that such compliance has been achieved.(2) The authorised fund manager must make and retain for six years a daily record of the units in the scheme held, acquired or disposed of by the authorised fund manager, including the classes of such
COLL 6.6.12RRP
(1) The depositary of an authorised fund is responsible for the safekeeping of all of the scheme property (other than tangible movable property) entrusted to it and must:(a) take all steps and complete all documents needed to ensure completion of transactions properly entered into for the account of the scheme;(b) ensure that scheme property in registered form is, as soon as practicable, registered in the name of the depositary, its nominee, or a person retained by it under COLL
MAR 4.3.5RRP
A firm must provide to the Takeover Panel:(1) any information and documents in its possession or under its control which the Takeover Panel requests to enable the Takeover Panel to perform its functions; and(2) such assistance as the Takeover Panel requests and as the firm is reasonably able to provide to enable the Takeover Panel to perform its functions.
MAR 4.3.6GRP
In MAR 4.3.5 R, "documents" includes information recorded in any form and, in relation to information recorded otherwise than in legible form, references to providing documents include references to producing a copy of the information in legible form.
CASS 3.2.2RRP
A firm that receives or holds a client's assets under an arrangement to which this section applies and which exercises its right to treat the assets as its own must ensure that it maintains adequate records to enable it to meet any future obligations including the return of equivalent assets to the client.
MCOB 7.2.1GRP
(1) This chapter amplifies Principle 6 and Principle 7, which require a firm to pay due regard to the information needs of its customers and to treat them fairly. (2) Where a firm provides services to a customer in relation to a further advance, rate switch, or addition or removal of a party to a regulated mortgage contract, this chapter also requires that the customer is provided with an illustration to make clear the price and features associated with that variation.1(3) This
COLL 8.4.5RRP
A qualified investor scheme may invest in units in a scheme (a second scheme) only if the second scheme is:(1) a regulated collective investment scheme; or(2) a scheme not within (1) where the authorised fund manager has taken reasonable care to determine that:(a) it is the subject of an independent annual audit conducted in accordance with international accounting standards;(b) it has its value verified by a person independent from its operator in relation to each day on which
COLL 4.5.10RRP
The comparative table required by COLL 4.5.7R (1)(c) (Contents of the annual long report) must set out:(1) a performance record over the last five calendar years, or if the authorised fund has not been in existence during the whole of that period, over the whole period in which it has been in existence, showing:(a) the highest and the lowest price of a unit of each class in issue during each of those years; and(b) the net income distributed (or, for accumulation units, allocated)
COLL 4.5.12RRP
The authorised fund manager must ensure that the report of the auditor to the unitholders must include a statement:(1) whether, in the auditor's opinion, the accounts have been properly prepared in accordance with the IMA SORP, the rules in this sourcebook, and the instrument constituting the scheme;(2) whether, in the auditor's opinion, the accounts give a true and fair view of the net incomeand the net gains or losses ofthe scheme property of the authorised fund (or, as the
SUP 16.8.23RRP
1A firm must make and retain such records as will enable it to:(1) monitor regularly the persistency of life policies and stakeholder pensions effected through each of its representatives; and (2) make persistency reports or data reports to the FSA in accordance with SUP 16.8.3R.
SUP 16.8.24GRP
1In order to comply with SUP 16.8.23 R, a firm will as a minimum need to make and retain separate records for:(1) life policies and stakeholder pensions originally promoted: (a) by representatives; or(b) by independent intermediaries; or(c) through the firm's own direct offer financial promotions; or(d) as adopted packaged products;(2) life policies and stakeholder pensions not within (1), including those effected as execution-only transactions,for inclusion in the relevant form
COLL 6.3.6GRP

Table: This table belongs to COLL 6.3.2 G (2) (a).

Valuation and pricing

1

The valuation of scheme property

(1)

Where possible, investments should be valued using a reputable source. The reliability of the source of prices should be kept under regular review.

(2)

An investment for which different prices are quoted according to whether it is being bought or sold should be valued at its mid-market price. The instrument constituting the scheme should set out the valuation method that will apply where a single price for buying and selling a security is quoted.

(3)

Any part of the scheme property of an authorised fund that is not an investment should be valued at a fair value, but for immovables this is subject to COLL 5.6.20 R (3) (f) (Standing independent valuer and valuation).

(4)

For the purposes of (2) and (3), any fiscal charges, commissions, professional fees or other charges that were paid, or would be payable on acquiring or disposing of the investment or other part of the scheme property should be excluded from the value of an investment or other part of the scheme property.

(5)

Where the authorised fund manager has reasonable grounds to believe that:

it should value an investment at a price which, in its opinion, reflects a fair and reasonable price for that investment (the fair value price);

(6)

The circumstances which may give rise to a fair value price being used include:

  • no recent trade in the security concerned; or
  • the occurrence of a significant event since the most recent closure of the market where the price of the security is taken.
In (b), a significant event is one that means the most recent price of a security or a basket of securities is materially different to the price that it is reasonably believed would exist at the valuation point had the relevant market been open.

(7)

In determining whether to use such a fair value price , the authorised fund manager should include in his consideration:

(8)

The authorised fund manager should document the basis of valuation (including any fair value pricing policy) and, where appropriate, the basis of any methodology and ensure that the procedures are applied consistently and fairly.

(9)

Where a unit price is determined using properly applied fair value prices in accordance with policies in (8), subsequent information that indicates the price should have been different from that calculated will not normally give rise to an instance of incorrect pricing.

2

The pricing controls of the authorised fund manager

(1)

An authorised fund manager needs to be able to demonstrate that it has effective controls over its calculations of unit prices.

(2)

The controls referred to in (1) should ensure that:

  • asset prices are accurate and up to date;
  • investmenttransactions are accurately and promptly reflected in valuations;
  • the components of the valuation (including stock, cash, and units in issue), are regularly reconciled to their source or prime records and any reconciling items resolved promptly and debtors reviewed for recoverability;
  • the sources of prices not obtained from the main pricing source are recorded and regularly reviewed;
  • compliance with the investment and borrowing powers is regularly reviewed;
  • dividends are accounted for as soon as stocks are quoted ex-dividend (unless it is prudent to account for them on receipt):
  • fixed interest dividends, interest and expenses are accrued at each valuation point;
  • tax positions are regularly reviewed and adjusted, if necessary;
  • reasonable tolerances are set for movements in the key elements of a valuation and movements outside these tolerances are investigated; and
  • the fund manager regularly reviews the portfolio valuation for accuracy.

(3)

In exercising its pricing controls, the authorised fund manager may exercise reasonable discretion in determining the appropriate frequency of the operation of the controls and may choose a longer interval, if appropriate, given the level of activity on the fundor the materiality of any effect on the price.

(4)

Evidence of the exercise of the pricing controls should be retained.

(5)

Evidence of persistent or repetitive errors in relation to these matters, and in particular any evidence of a pattern of errors working in an authorised fund manager's favour, will make demonstrating effective controls more difficult.

(6)

Where the pricingfunction is delegated to a third party, COLL 6.6.15 R (1) (Committees and delegation) will apply.

3

The depositary's review of the authorised fund manager's systems and controls

(1)

This section provides details of the types of checks a depositary should carry out to be satisfied that the authorised fund manager adopts systems and controls which are appropriate to ensure that prices of units are calculated in accordance with this section and to ensure that the likelihood of incorrect prices will be minimised. These checks also apply where an authorised fund manager has delegated all or some of its pricing functions to a third party.

(2)

A depositary should thoroughly review an authorised fund manager's systems and controls to confirm that they are satisfactory. The depositary's review should include an analysis of the controls in place to determine the extent to which reliance can be placed on them.

(3)

A review should be performed when the depositary is appointed and thereafter as it feels appropriate given its knowledge of the robustness and the stability of the systems and controls and their operation.

(4)

A review should be carried out more frequently where a depositary knows or suspects that an authorised fund manager's systems and controls are weak or are otherwise unsatisfactory.

(5)

Additionally, a depositary should from time to time review other aspects of the valuation of the scheme property of each authorised fund for which it is responsible, verifying, on a sample basis, if necessary, the assets, liabilities, accruals, units in issue, securities prices (and in particular the prices of unapproved securities and the basis for the valuation of unquoted securities) and any other relevant matters, for example an accumulation factor or a currency conversion factor.

(6)

A depositary should ensure that any issues, which are identified in any such review, are properly followed up and resolved.

4

The recording and reporting of instances of incorrect pricing

(1)

An authorised fund manager should record each instance where the price of a unit is incorrect as soon as the error is discovered, and report the fact to the depositary together with details of the action taken, or to be taken, to avoid repetition as soon as practicable.

(2)

In accordance with COLL 6.6.11 G (Duty to inform the FSA), the depositary should report any breach of the rules in COLL 6.3 immediately to the FSA. However, notification should relate to instances which the depositary considers material only.

(3)

A depositary should also report to the FSA immediately any instance of incorrect pricingwhere the error is 0.5% or more of the price of a unit, where a depositary believes that reimbursement or payment is inappropriate and should not be paid by an authorised fund manager.

(4)

In accordance with SUP 16.6.8 R, a depositary should also make a return to the FSA on a quarterly basis which summarises the number of instances of incorrect pricing during a particular period.

5

The rectification of pricing breaches

(1)

COLL 6.6.3 R (1) (Functions of the authorised fund manager) places a duty on the authorised fund manager to take action to reimburse affected unitholders, former unitholders, and the scheme itself, for instances of incorrect pricing, except if it appears to the depositary that the breach is of minimal significance.

(2)

A depositary may consider that the instance of incorrect pricingis of minimal significance if:

(3)

In determining (2), if the instance of incorrect pricing is due to one or more factors or exists over a period of time, each price should be considered separately.

(4)

If a depositary deems it appropriate, it may, in spite of the circumstances outlined in (2), require a payment from the authorised fund manager or from the authorised fund to the unitholders, former unitholders, the authorised fund or the authorised fund manager (where appropriate).

(5)

The depositary should satisfy itself that any payments required following an instance of incorrect pricing are accurately and promptly calculated and paid.

(6)

If a depositary considers that reimbursement or payment is inappropriate, it should report the matter to the FSA, together with its recommendation and justification. The depositary should take into account the need to avoid prejudice to the rights of unitholders, or the rights of unitholders in a class of units.

(7)

It may not be practicable, or in some cases legally permissible, for the authorised fund manager to obtain reimbursement from unitholders, where the unitholders have benefited from the incorrect price.

(8)

In all cases where reimbursement or payment is required, amounts due to be reimbursed to unitholders for individual sums which are reasonably considered by the authorised fund manager and depositary to be immaterial, need not normally be paid.

COLL 7.3.6RRP
(1) Winding up or termination must commence once the conditions referred to in COLL 7.3.4 R (3) are both satisfied or, if later, once the events in COLL 7.3.4 R (4) have occurred. (2) Once winding up or termination has commenced: (a) COLL 6.2 (Dealing), COLL 6.3 (Valuation and pricing) and COLL 5 (Investment and borrowing powers) cease to apply to the ICVC or to the units and scheme property in the case of a sub-fund; (b) the ICVC must cease to issue and cancel units;(c) the
COLL 7.3.7RRP
(1) Paragraphs (2) to (9) of this rule apply to winding up an ICVC and termination of a sub-fund, paragraph (10) only applies to the winding up of an ICVC and paragraphs (11) to (15) only apply to the termination of a sub-fund of an ICVC.(2) The ACD must, as soon as practicable after winding up or termination has commenced, cause the scheme property to be realised and the liabilities of the ICVC or the sub-fund to be met out of the proceeds.(3) The ACD must instruct the depositary